A Bill for an Act
Page 1, Line 101Concerning the resiliency of the systems that provide
Page 1, Line 102electricity.
Bill Summary
(Note: This summary applies to this bill as introduced and does not reflect any amendments that may be subsequently adopted. If this bill passes third reading in the house of introduction, a bill summary that applies to the reengrossed version of this bill will be available at http://leg.colorado.gov.)
The bill creates the Colorado electric grid resiliency task force (task force) to study the issue of grid resilience and to make recommendations to the governor and the general assembly. The task force is 18 members.
The president of the senate and the speaker of the house of representatives shall organize and call the first meeting of the task force by November 28, 2026. The task force meets at least once every month until it completes its duties, but the chair may call additional meetings. Upon request by the task force, the department of regulatory agencies shall provide office space, equipment, and staff services as necessary.
The task force has the following duties on a biennial basis:
- Doing a rigorous, uniform engineering assessment of every covered transformer in Colorado;
- Developing a prioritized statewide hardening and spare-transformer plan with cost estimates, cost-benefit analyses, and recommended funding mechanisms;
- Recommending rules, legislation, and interstate or federal cost-sharing arrangements and publishing a report detailing these recommendations; and
- Reporting its findings to the house of representatives energy and environment committee and the senate transportation and energy committee.
The bill sets minimum technical standards for the assessment, plan, and recommendations.
A transmission-owning entity must participate in the task force assessment and provide any requested data. These entities may recover reasonable and prudent costs incurred to comply with the bill through rates, member assessments, or ordinary budgeting processes.
Owners or operators of covered transformers are required to file with the federal energy regulatory commission a report, marked as "Critical Energy/Electric Infrastructure Information". Standards are set for the report. Biennially, the public utilities commission must prepare a summary of the report and present it to the house of representatives energy and environment committee and the senate transportation and energy committee.
The public utilities commission must adopt rules requiring implementation of the highest-priority hardware-based mitigation measures identified by the task force unless equivalent protection is demonstrated.
The task force repeals on September 1, 2031. Before the repeal, it is scheduled for review under the sunset law.
Page 2, Line 1Be it enacted by the General Assembly of the State of Colorado:
Page 2, Line 2SECTION 1. Legislative declaration. (1) The general assembly
Page 2, Line 3finds and declares that:
Page 2, Line 4(a) Colorado's electric grid is vulnerable to severe space weather
Page 2, Line 5events and to the late-time component of a high-altitude electromagnetic
Page 3, Line 1pulse;
Page 3, Line 2(b) Geomagnetically induced currents entering the grid through
Page 3, Line 3grounded transformer neutrals can cause half-cycle saturation, excessive
Page 3, Line 4reactive power consumption, harmonic distortion, and catastrophic failure
Page 3, Line 5of extra-high-voltage transformers that require 3 to 6 years or longer to
Page 3, Line 6replace;
Page 3, Line 7(c) Not all transmission-owning entities in Colorado are subject
Page 3, Line 8to the jurisdiction of the public utilities commission;
Page 3, Line 9(d) A coordinated, statewide approach that includes
Page 3, Line 10investor-owned utilities, rural electric cooperatives and their wholesale
Page 3, Line 11providers, municipal utilities, and federal power marketing
Page 3, Line 12administrations is essential;
Page 3, Line 13(e) In 2013, President Barack Obama recognized the electric grid
Page 3, Line 14as one of the nation's most vital critical infrastructure sectors in
Page 3, Line 15presidential policy directive 21 and executive order 13636, declaring that
Page 3, Line 16its incapacity or destruction "would have a debilitating impact on security,
Page 3, Line 17national economic security, national public health or safety, or any
Page 3, Line 18combination of those matters", thereby establishing grid resiliency as an
Page 3, Line 19urgent, bipartisan national priority; and
Page 3, Line 20(f) Targeted, hardware-based hardening represents a prudent,
Page 3, Line 21cost-effective insurance policy against potentially catastrophic blackouts.
Page 3, Line 22SECTION 2. In Colorado Revised Statutes, add article 44 to title
Page 3, Line 2340 as follows:
Page 3, Line 24ARTICLE 44
Page 3, Line 25Electric Grid Resiliency
Page 3, Line 2640-44-101. Definitions.
Page 3, Line 27(1) "Commission" means the public utilities commission.
Page 4, Line 1(2) "Covered entity" means a person that owns or operates
Page 4, Line 2a covered transformer.
Page 4, Line 3(3) "Covered transformer" means a power transformer or
Page 4, Line 4generator step-up transformer with a high-side operating
Page 4, Line 5voltage of one hundred kilovolts or more and a nameplate
Page 4, Line 6rating of twenty-five million volt-amperes or more located in
Page 4, Line 7Colorado or serving Colorado load.
Page 4, Line 8(4) (a) "Hardware-based mitigation" means the use of
Page 4, Line 9advanced systems, devices, and materials in hardware to
Page 4, Line 10enhance the resilience and reliability of electric grid
Page 4, Line 11components.
Page 4, Line 12(b) "Hardware-based mitigation" includes the
Page 4, Line 13development of transformer resilience, solid-state power
Page 4, Line 14substations, and microgrids.
Page 4, Line 15(5) "Task force" means the Colorado electric grid
Page 4, Line 16resiliency task force created in section 40-44-102.
Page 4, Line 17(6) (a) "Transmission-owning entity" means a person that
Page 4, Line 18owns, operates, or controls covered transformers.
Page 4, Line 19(b) "Transmission-owning entity" includes investor-owned
Page 4, Line 20utilities, cooperative electric associations, municipally owned
Page 4, Line 21utilities, wholesale generation and transmission providers, and
Page 4, Line 22federal power marketing administrations.
Page 4, Line 2340-44-102. Colorado electric grid resiliency task force -
Page 4, Line 24creation - membership.
Page 4, Line 25(1) Creation and duration.The Colorado electric grid
Page 4, Line 26resiliency task force is created to study the issue of grid
Page 4, Line 27resilience and to make recommendations to the governor and
Page 5, Line 1the general assembly.
Page 5, Line 2(2) Membership.The task force consists of the following
Page 5, Line 3eighteen members:
Page 5, Line 4(a) (I) (A) Four legislative members, appointed by the
Page 5, Line 5president of the senate and the speaker of the house of
Page 5, Line 6representatives, with two members from each chamber and two
Page 5, Line 7members from each major political party, as defined in section
Page 5, Line 81-1-104 (22);
Page 5, Line 9(B) The director of the Colorado resiliency office
Page 5, Line 10established in section 24-32-121 within the department of local
Page 5, Line 11affairs, or the director's designee;
Page 5, Line 12(C) The director of the division of homeland security and
Page 5, Line 13emergency management created in section 24-33.5-1603 within
Page 5, Line 14the department of public safety, or the director's designee; and
Page 5, Line 15(D) The executive director of the department of
Page 5, Line 16regulatory agencies, or the executive director's designee.
Page 5, Line 17(II) The members appointed pursuant to subsections
Page 5, Line 18(2)(a)(I)(A) to (2)(a)(I)(D) of this section constitute a panel that
Page 5, Line 19shall appoint by majority vote:
Page 5, Line 20(A) Two representatives of investor-owned utilities;
Page 5, Line 21(B) Two representatives of rural electric cooperatives or
Page 5, Line 22rural electric wholesale providers;
Page 5, Line 23(C) Two representatives of municipally owned electric
Page 5, Line 24utilities, either a single utility or joint action agencies created
Page 5, Line 25by multiple municipally owned electric utilities;
Page 5, Line 26(D) One representative of a multistate generation and
Page 5, Line 27transmission association;
Page 6, Line 1(E) One member with technical expertise in engineering
Page 6, Line 2related to geomagnetically induced currents and high-altitude
Page 6, Line 3electromagnetic pulses;
Page 6, Line 4(F) One member with technical expertise in transmission
Page 6, Line 5planning; and
Page 6, Line 6(G) One representative of large industrial power users.
Page 6, Line 7(III) A utility or an association of utilities may nominate
Page 6, Line 8individuals described in subsections (2)(a)(II)(A) to (2)(a)(II)(G) of
Page 6, Line 9this section to the panel described in the introductory portion
Page 6, Line 10of subsection (2)(a)(II) of this section.
Page 6, Line 11(b) The chief executive officer of the western area power
Page 6, Line 12administration within the United States department of energy,
Page 6, Line 13or the chief executive officer's designee.
Page 6, Line 14(3) Appointment authority - terms.
Page 6, Line 15(a) (I) The appointing authorities described in subsection
Page 6, Line 16(2)(a)(I)(A) of this section shall make their initial appointments
Page 6, Line 17to the task force no later than September 12, 2026. The members
Page 6, Line 18appointed under subsection (2)(a)(I)(A) of this section serve a
Page 6, Line 19term of two years. The members appointed under subsection
Page 6, Line 20(2)(a)(II) of this section serve a term of four years.
Page 6, Line 21(II) The panel described in subsection (2)(a)(II) of this
Page 6, Line 22section shall make its initial appointments to the task force no
Page 6, Line 23later than October 30, 2026.
Page 6, Line 24(b) Each member of the task force who is appointed under
Page 6, Line 25subsection (2) of this section serves at the pleasure of the
Page 6, Line 26appointing official. If a task force member is removed by the
Page 6, Line 27appointing authority or resigns, the appointing authority shall
Page 7, Line 1appoint another member to fill the vacancy within forty-eight
Page 7, Line 2days following the removal.
Page 7, Line 3(4) Remuneration.
Page 7, Line 4(a) Notwithstanding section 2-2-326, each legislative
Page 7, Line 5member of the task force serves without compensation but is
Page 7, Line 6entitled to receive reimbursement for actual and necessary
Page 7, Line 7expenses incurred in the performance of the member's duties on
Page 7, Line 8the task force.
Page 7, Line 9(b) The nonlegislative members of the task force serve
Page 7, Line 10without compensation and without reimbursement for expenses;
Page 7, Line 11except that a task force member who is a state employee may be
Page 7, Line 12paid in accordance with the state employee's normal pay.
Page 7, Line 13(5) Meetings.
Page 7, Line 14(a) The president of the senate and the speaker of the
Page 7, Line 15house of representatives shall organize and call the first
Page 7, Line 16meeting of the task force by November 28, 2026.
Page 7, Line 17(b) The task force shall elect a chair from among its
Page 7, Line 18members.
Page 7, Line 19(c) The task force shall meet at least once every month
Page 7, Line 20until it completes its duties described in section 40-44-103. The
Page 7, Line 21chair may call such additional meetings as are necessary for
Page 7, Line 22the task force to complete its duties.
Page 7, Line 23(6) Department of regulatory agencies support.Upon request
Page 7, Line 24by the task force, the department of regulatory agencies shall
Page 7, Line 25provide office space, equipment, and staff services as may be
Page 7, Line 26necessary to implement this article 44.
Page 7, Line 2740-44-103. Task force duties.
Page 8, Line 1(1) Duties.The task force shall:
Page 8, Line 2(a) On or before July 1, 2028, and July 1 of each
Page 8, Line 3even-numbered year thereafter, complete or cause to be
Page 8, Line 4completed a rigorous, uniform engineering assessment of every
Page 8, Line 5covered transformer in Colorado;
Page 8, Line 6(b) On or before July 1, 2028, and July 1 of each
Page 8, Line 7even-numbered year thereafter, develop a prioritized statewide
Page 8, Line 8hardening and spare-transformer plan with cost estimates,
Page 8, Line 9cost-benefit analyses, and recommended funding mechanisms;
Page 8, Line 10(c) Recommend rules, legislation, and interstate or
Page 8, Line 11federal cost-sharing arrangements;
Page 8, Line 12(d) On or before November 15, 2028, and November 15 of
Page 8, Line 13each even-numbered year thereafter, publish a report detailing
Page 8, Line 14its recommendations concerning changing or proposing new
Page 8, Line 15rules, legislation, or interstate or federal cost-sharing
Page 8, Line 16arrangements; and
Page 8, Line 17(e) Notwithstanding section 24-1-136 (11)(a)(I), on or
Page 8, Line 18before February 1, 2029, and February 1 of each odd-numbered
Page 8, Line 19year thereafter, report its findings detailed in the report
Page 8, Line 20published in accordance with subsection (1)(d) of this section to
Page 8, Line 21the house of representatives energy and environment committee
Page 8, Line 22and the senate transportation and energy committee, or their
Page 8, Line 23successor committees.
Page 8, Line 24(2) Minimum technical standards.In completing the duties
Page 8, Line 25detailed in subsection (1) of this section, the task force must:
Page 8, Line 26(a) Use the late-time (E3) high-altitude electromagnetic
Page 8, Line 27pulse waveform and parameters specified in figure A.5 of
Page 9, Line 1International Electrotechnical Commission standard
Page 9, Line 261000-2-9:2025, with a peak electric field of eighty-five volts per
Page 9, Line 3kilometer and a peak magnetic field of twenty thousand
Page 9, Line 4nanoteslas for typical low-conductivity ground;
Page 9, Line 5(b) Model operating conditions at full rated load at the
Page 9, Line 6time of exposure;
Page 9, Line 7(c) Apply age and condition de-rating pursuant to
Page 9, Line 8Institute of Electrical and Electronics Engineers standard
Page 9, Line 9C57.91-2011 and C57.110-2018;
Page 9, Line 10(d) Incorporate site-specific or best-available regional
Page 9, Line 11ground conductivity models; and
Page 9, Line 12(e) Quantify, for each covered transformer, susceptibility
Page 9, Line 13to half-cycle saturation, geomagnetically-induced-current
Page 9, Line 14driven harmonics, reactive power absorption, and hot-spot
Page 9, Line 15heating or insulation degradation.
Page 9, Line 1640-44-104. Mandatory participation and cost recovery.
Page 9, Line 17(1) A transmission-owning entity shall participate in the
Page 9, Line 18task force assessment described in section 40-44-103 and provide
Page 9, Line 19any requested data.
Page 9, Line 20(2) Reasonable and prudent costs incurred to comply with
Page 9, Line 21this article 44 or rules adopted under this article 44 are
Page 9, Line 22recoverable through rates, member assessments, or ordinary
Page 9, Line 23budgeting processes.
Page 9, Line 2440-44-105. Reporting.
Page 9, Line 25(1) On or before December 31, 2027, and December 31 of
Page 9, Line 26each odd-numbered year thereafter, a covered entity shall file
Page 9, Line 27with the federal energy regulatory commission a report,
Page 10, Line 1marked as "Critical Energy/Electric Infrastructure
Page 10, Line 2Information", containing:
Page 10, Line 3(a) Transformer specifications and information, including:
Page 10, Line 4(I) Transformer manufacturers;
Page 10, Line 5(II) Country and date of manufacture;
Page 10, Line 6(III) Date energized;
Page 10, Line 7(IV) General location and function;
Page 10, Line 8(V) Detailed design data, including core type, winding
Page 10, Line 9configuration, measured or calculated direct current
Page 10, Line 10resistance, and single-phase or three-phase power; and
Page 10, Line 11(VI) Megavolt-amperes rating and voltage ratio;
Page 10, Line 12(b) Susceptibility findings as described in section 40-44-103
Page 10, Line 13(2)(e);
Page 10, Line 14(c) Estimated replacement cost and lead time;
Page 10, Line 15(d) Recommended mitigation measures and cost estimates,
Page 10, Line 16to include:
Page 10, Line 17(I) Explicit categorization of options by cost tier and
Page 10, Line 18effectiveness, with a preference for hardware upgrades over
Page 10, Line 19deploying spare hardware;
Page 10, Line 20(II) Interstate cost-sharing options; and
Page 10, Line 21(III) Cost-benefit analyses of mitigation strategies;
Page 10, Line 22(e) A prioritized list for hardening or spare procurement
Page 10, Line 23focused on automatic, nonprocedural hardware-based
Page 10, Line 24mitigation, but reactive operational procedures alone are not
Page 10, Line 25sufficient protection under this subsection (1)(e), with blocking
Page 10, Line 26or significantly reducing geomagnetically induced currents
Page 10, Line 27flow as the primary focus; and
Page 11, Line 1(f) Recommended funding mechanisms, including federal
Page 11, Line 2grants and rate recovery.
Page 11, Line 3(2) Notwithstanding section 24-1-136 (11)(a)(I), on or
Page 11, Line 4before February 1, 2029, and February 1 of each odd-numbered
Page 11, Line 5year thereafter, the commission shall prepare a summary of the
Page 11, Line 6reports described in subsection (1) of this section and present it
Page 11, Line 7to the house of representatives energy and environment
Page 11, Line 8committee and the senate transportation and energy committee,
Page 11, Line 9or their successor committees.
Page 11, Line 1040-44-106. Sunset review - repeal.
Page 11, Line 11Sections 40-44-102 to 40-44-105 are repealed, effective
Page 11, Line 12September 1, 2031. Before the repeal, sections 40-44-102 to
Page 11, Line 1340-44-104 are scheduled for review in accordance with section
Page 11, Line 142-3-1203.
Page 11, Line 1540-44-107. Rules.
Page 11, Line 16On or before July 1, 2029, the commission shall adopt rules
Page 11, Line 17applicable to entities under its jurisdiction requiring
Page 11, Line 18implementation of the highest-priority hardware-based
Page 11, Line 19mitigation measures identified by the task force unless
Page 11, Line 20equivalent protection is demonstrated.
Page 11, Line 21SECTION 3. In Colorado Revised Statutes, 2-3-1203, add
Page 11, Line 22(22)(a)(IX) as follows:
Page 11, Line 232-3-1203. Sunset review of advisory committees - legislative
Page 11, Line 24declaration - definition - repeal.
Page 11, Line 25(22) (a) The following statutory authorizations for the designated
Page 11, Line 26advisory committees will repeal on September 1, 2031:
Page 11, Line 27(IX) The Colorado electric grid resiliency task force
Page 12, Line 1created in section 40-44-102.
Page 12, Line 2SECTION 4. Act subject to petition - effective date. This act
Page 12, Line 3takes effect at 12:01 a.m. on the day following the expiration of the
Page 12, Line 4ninety-day period after final adjournment of the general assembly (August
Page 12, Line 512, 2026, if adjournment sine die is on May 13, 2026); except that, if a
Page 12, Line 6referendum petition is filed pursuant to section 1 (3) of article V of the
Page 12, Line 7state constitution against this act or an item, section, or part of this act
Page 12, Line 8within such period, then the act, item, section, or part will not take effect
Page 12, Line 9unless approved by the people at the general election to be held in
Page 12, Line 10November 2026 and, in such case, will take effect on the date of the
Page 12, Line 11official declaration of the vote thereon by the governor.