A Bill for an Act
Page 1, Line 101Concerning measures to optimize Colorado's electric
Page 1, Line 102transmission system.
Bill Summary
(Note: This summary applies to this bill as introduced and does not reflect any amendments that may be subsequently adopted. If this bill passes third reading in the house of introduction, a bill summary that applies to the reengrossed version of this bill will be available at http://leg.colorado.gov.)
Section 3 of the bill defines "advanced transmission technologies" as hardware or software technologies that increase the capacity, efficiency, reliability, or resiliency of an existing or new transmission facility.
Section 4 requires the Colorado public utilities commission (commission) to adopt rules requiring a regulated electric utility to consider advanced transmission technologies in the electric utility's 10-year transmission plan and to identify strategies to reduce the costs of new transmission.
Section 5 requires the Colorado electric transmission authority (authority) to, as much as practicable, engage and coordinate with formal subregional transmission planning organizations.
Under current law, the authority is required to annually submit a report of its activities, including a complete operating and financial statement covering the operations of the authority for the previous state fiscal year, to certain committees of reference of the general assembly. Section 6 requires that the annual report also include a description of the activities and accomplishments of the authority during the previous calendar year.
Section 7 adds a nonvoting seat to the authority's board of directors for the director of the commission or the director's designee.
Page 2, Line 1Be it enacted by the General Assembly of the State of Colorado:
Page 2, Line 2SECTION 1. Short title. The short title of this act is the
Page 2, Line 3"Colorado Grid Optimization Act".
Page 2, Line 4SECTION 2. Legislative declaration. (1) The general assembly
Page 2, Line 5finds and declares that:
Page 2, Line 6(a) Both in-state and regional electric transmission systems are
Page 2, Line 7essential to maintaining grid reliability and resilience amid unprecedented
Page 2, Line 8load growth. As new transmission projects undergo lengthy planning,
Page 2, Line 9permitting, and review processes, commercially available and proven
Page 2, Line 10advanced transmission technologies present near-term opportunities to
Page 2, Line 11accelerate the interconnection of new resources, maximize the
Page 2, Line 12performance of existing transmission assets, and deliver least-cost energy
Page 2, Line 13to consumers.
Page 2, Line 14(b) Advanced transmission technologies are technologies that
Page 2, Line 15increase the capacity, efficiency, reliability, or resiliency of a transmission
Page 2, Line 16facility and have the potential to optimize the transmission grid by
Page 2, Line 17lowering costs, reducing congestion, and expediting the interconnection
Page 3, Line 1of new load;
Page 3, Line 2(c) Advanced transmission technologies have been shown to
Page 3, Line 3complement transmission expansion by optimizing the cost, utilization,
Page 3, Line 4and value of new transmission build-out. When planned in tandem with
Page 3, Line 5proposed new transmission facilities, these technologies can alleviate
Page 3, Line 6transmission constraints, improve system efficiency, inform more
Page 3, Line 7strategic siting and sequencing of infrastructure, and support broader
Page 3, Line 8benefits for customers, landowners, wildlife, and disproportionately
Page 3, Line 9impacted communities.
Page 3, Line 10(d) National analyses, the federal energy regulatory commission,
Page 3, Line 11and various state utility commissions have identified advanced
Page 3, Line 12transmission technologies as cost-effective tools that can be deployed on
Page 3, Line 13faster timelines than new transmission construction, thereby supporting
Page 3, Line 14near-term reliability and job creation while mitigating rate impacts for
Page 3, Line 15customers;
Page 3, Line 16(e) Strategic use of advanced transmission technologies also has
Page 3, Line 17the potential to reduce wildfire risk and prevent power outages during
Page 3, Line 18emergencies by improving real-time situational awareness and reducing
Page 3, Line 19stress on existing transmission lines under extreme conditions;
Page 3, Line 20(f) Integrating advanced transmission technologies into relevant
Page 3, Line 21transmission planning processes and decision-making can support
Page 3, Line 22Colorado's long-term energy affordability and grid modernization efforts
Page 3, Line 23by making sufficient information available to regulators and the public
Page 3, Line 24regarding where such technologies can deliver system-wide and customer
Page 3, Line 25benefits;
Page 3, Line 26(g) The Colorado electric transmission authority, referred to in this
Page 3, Line 27section as the "authority", was created by Senate Bill 21-072 to enable the
Page 4, Line 1expansion and financing of electric transmission facilities and
Page 4, Line 2infrastructure and has since helped advance the state's clean energy goals
Page 4, Line 3and reliability with an interregional focus. Additionally, Senate Bill
Page 4, Line 423-016 required the authority to conduct a transmission capacity
Page 4, Line 5expansion study to assess the need for expanded transmission capacity in
Page 4, Line 6the state.
Page 4, Line 7(h) It is in the state's best interest to have coordinated statewide
Page 4, Line 8transmission planning, and there is great potential value in the authority
Page 4, Line 9providing leadership in regional transmission coordination and
Page 4, Line 10interregional project development, including by supporting the
Page 4, Line 11advancement of priority projects through joint studies and the facilitation
Page 4, Line 12of multi-utility and grid operator collaboration where appropriate; and
Page 4, Line 13(i) Regional planning groups, along with the authority, can
Page 4, Line 14provide the state with a dedicated venue to coordinate interregional
Page 4, Line 15transmission needs and advocate for equitable cost allocation and public
Page 4, Line 16policy alignment in regional transmission organization governance
Page 4, Line 17structures.
Page 4, Line 18SECTION 3. In Colorado Revised Statutes, 40-42-102, add (1.3),
Page 4, Line 19(1.5), and (12.5) as follows:
Page 4, Line 2040-42-102. Definitions.
Page 4, Line 21As used in this article 42, unless the context otherwise requires:
Page 4, Line 22(1.3) "Advanced conductor" means a conductor
Page 4, Line 23technology used in an electric transmission system that, when
Page 4, Line 24compared to an aluminum conductor steel reinforced
Page 4, Line 25conductor of the same diameter, plus or minus one percent:
Page 4, Line 26(a) Has a direct current electrical resistance, measured
Page 4, Line 27at a standard reference temperature of twenty degrees Celsius
Page 5, Line 1consistent with industry practice, that is at least fifteen
Page 5, Line 2percent lower; and
Page 5, Line 3(b) Increases the potential energy carrying capacity by
Page 5, Line 4at least seventy-five percent or meets higher performance
Page 5, Line 5standards recognized by the commission to account for
Page 5, Line 6evolving technologies or transmission system needs.
Page 5, Line 7(1.5) "Advanced transmission technologies" means
Page 5, Line 8hardware or software technologies that increase the capacity,
Page 5, Line 9efficiency, reliability, or resiliency of an existing or new
Page 5, Line 10transmission facility, including:
Page 5, Line 11(a) Advanced conductors; and
Page 5, Line 12(b) Grid-enhancing technologies.
Page 5, Line 13(12.5) "Grid-enhancing technology" means a hardware or
Page 5, Line 14software technology that reduces congestion or enhances the
Page 5, Line 15flexibility of electric transmission and distribution systems by
Page 5, Line 16increasing the capacity of a transmission or distribution line, or
Page 5, Line 17by rerouting electricity from overloaded lines to uncongested
Page 5, Line 18lines, while maintaining industry safety standards.
Page 5, Line 19"Grid-enhancing technology" includes:
Page 5, Line 20(a) Dynamic line ratings;
Page 5, Line 21(b) Advanced power flow controllers;
Page 5, Line 22(c) Topology optimization;
Page 5, Line 23(d) Energy storage, when used as a transmission or
Page 5, Line 24distribution resource; and
Page 5, Line 25(e) Other technologies that increase grid reliability,
Page 5, Line 26flexibility, and capacity.
Page 5, Line 27SECTION 4. In Colorado Revised Statutes, 40-2-126, amend (6)
Page 6, Line 1as follows:
Page 6, Line 240-2-126. Transmission facilities - biennial review - energy
Page 6, Line 3resource zones - plans - approval - cost recovery - powerline trail
Page 6, Line 4consideration - rules - definitions.
Page 6, Line 5(6) The commission shall amend its rules requiring the filing of
Page 6, Line 6ten-year transmission plans by utilities to also require utilities to:
Page 6, Line 7(a) Consider and address plans for the construction of new
Page 6, Line 8powerline trails in coordination with applicable local governments in each
Page 6, Line 9two-year update to a ten-year transmission plan;
andPage 6, Line 10(b) Demonstrate compliance with section 33-45-103 (2);
Page 6, Line 11(c) Identify strategies to reduce the costs of
Page 6, Line 12construction and obtaining adequate financing for identified
Page 6, Line 13projects in the utility's ten-year transmission plan, including by
Page 6, Line 14using bonds issued by the Colorado electric transmission
Page 6, Line 15authority pursuant to section 40-42-104 (1)(r). If a utility
Page 6, Line 16identifies or evaluates the potential use of bonds issued by the
Page 6, Line 17Colorado electric transmission authority as a cost-reduction
Page 6, Line 18strategy in the utility's ten-year transmission plan, the utility
Page 6, Line 19shall consult with the Colorado electric transmission
Page 6, Line 20authority prior to filing the utility's ten-year transmission
Page 6, Line 21plan.
Page 6, Line 22(d) Incorporate, in the utility's ten-year transmission
Page 6, Line 23plan, an evaluation of the potential of advanced transmission
Page 6, Line 24technologies, as defined in section 40-42-102 (1.5), to meet
Page 6, Line 25transmission needs and realize potential benefits, which
Page 6, Line 26evaluation must include:
Page 6, Line 27(I) A technical feasibility assessment;
Page 7, Line 1(II) A cost-effectiveness analysis and timetable for
Page 7, Line 2potential deployment;
Page 7, Line 3(III) An assessment of advanced transmission
Page 7, Line 4technologies with the potential to achieve the following:
Page 7, Line 5(A) An increase in transmission system capacity,
Page 7, Line 6cost-effectiveness, reliability, or resiliency;
Page 7, Line 7(B) A reduction of transmission system congestion;
Page 7, Line 8(C) A reduction in the timeline to connect new generation
Page 7, Line 9or load to the grid;
Page 7, Line 10(D) A reduction of the risk of igniting wildfires;
Page 7, Line 11(E) An increase in capacity to connect new renewable
Page 7, Line 12energy and clean energy resources; or
Page 7, Line 13(F) An increase in the transfer capability of electricity
Page 7, Line 14between Colorado and neighboring states;
Page 7, Line 15(IV) A description of any additional potential benefits of
Page 7, Line 16deploying advanced transmission technologies, which benefits
Page 7, Line 17may include:
Page 7, Line 18(A) The ability to meet short-term transmission needs
Page 7, Line 19while new transmission is being sited, permitted, or constructed;
Page 7, Line 20and
Page 7, Line 21(B) A reduction in impacts to high-priority habitats,
Page 7, Line 22wildlife movement corridors and crossings, and species of
Page 7, Line 23greatest conservation need, as identified by the division of parks
Page 7, Line 24and wildlife created in section 33-9-104; and
Page 7, Line 25(V) If advanced transmission technologies are found to
Page 7, Line 26offer a more cost-effective strategy to achieve the goals listed
Page 7, Line 27in subsection (6)(d)(III) of this section, whether in combination
Page 8, Line 1with or instead of other capital investments, but are not
Page 8, Line 2incorporated into the utility's ten-year transmission plan, a
Page 8, Line 3detailed explanation, including relevant analyses, explaining
Page 8, Line 4why advanced transmission technologies should not be
Page 8, Line 5deployed to meet a specific need or in lieu of another project.
Page 8, Line 6SECTION 5. In Colorado Revised Statutes, 40-42-104, add (10)
Page 8, Line 7as follows:
Page 8, Line 840-42-104. General and specific powers and duties of the
Page 8, Line 9authority.
Page 8, Line 10(10) In conducting its duties in accordance with this
Page 8, Line 11article 42, the authority shall, to the extent practicable,
Page 8, Line 12engage and coordinate with formal subregional transmission
Page 8, Line 13planning organizations.
Page 8, Line 14SECTION 6. In Colorado Revised Statutes, amend 40-42-108 as
Page 8, Line 15follows:
Page 8, Line 1640-42-108. Report to general assembly.
Page 8, Line 17Commencing in 2022, the authority shall submit a report of its
Page 8, Line 18activities to the energy and environment committee of the house of
Page 8, Line 19representatives and the transportation and energy committee of the senate,
Page 8, Line 20or any successor committees, not later than
December 1 January 31 ofPage 8, Line 21each year. The report shall set forth a complete operating and financial
Page 8, Line 22statement covering the operations of the authority for the previous state
Page 8, Line 23fiscal year and a description of the activities and accomplishments
Page 8, Line 24of the authority during the previous calendar year.
Page 8, Line 25Notwithstanding section 24-1-136 (11)(a)(I), the requirement to submit
Page 8, Line 26the report continues indefinitely.
Page 8, Line 27SECTION 7. In Colorado Revised Statutes, 40-42-103, amend
Page 9, Line 1(2)(a) as follows:
Page 9, Line 240-42-103. Authority - creation - board - open meetings and
Page 9, Line 3open records.
Page 9, Line 4(2) (a) The powers of the authority are vested in a board of
Page 9, Line 5directors, which consists of the following
nine ten members:Page 9, Line 6(I) Two members appointed by the governor with the consent of
Page 9, Line 7the senate;
Page 9, Line 8(II) The director of the Colorado energy office created in section
Page 9, Line 924-38.5-101 or the director's designee;
Page 9, Line 10(III) Three members appointed by the speaker of the house of
Page 9, Line 11representatives;
andPage 9, Line 12(IV) Three members appointed by the president of the senate; and
Page 9, Line 13(V) The director of the commission or the director's
Page 9, Line 14designee, who is a nonvoting ex officio member.
Page 9, Line 15SECTION 8. Act subject to petition - effective date. This act
Page 9, Line 16takes effect at 12:01 a.m. on the day following the expiration of the
Page 9, Line 17ninety-day period after final adjournment of the general assembly (August
Page 9, Line 1812, 2026, if adjournment sine die is on May 13, 2026); except that, if a
Page 9, Line 19referendum petition is filed pursuant to section 1 (3) of article V of the
Page 9, Line 20state constitution against this act or an item, section, or part of this act
Page 9, Line 21within such period, then the act, item, section, or part will not take effect
Page 9, Line 22unless approved by the people at the general election to be held in
Page 9, Line 23November 2026 and, in such case, will take effect on the date of the
Page 9, Line 24official declaration of the vote thereon by the governor.