A Bill for an Act
Page 1, Line 101Concerning requirements to foster distributed energy
Page 1, Line 102resources in the state.
Bill Summary
(Note: This summary applies to this bill as introduced and does not reflect any amendments that may be subsequently adopted. If this bill passes third reading in the house of introduction, a bill summary that applies to the reengrossed version of this bill will be available at http://leg.colorado.gov.)
Under current law, each subscriber to a community solar garden receives a net metering credit to their electric bill. The community solar subscriber organization can choose between a fixed bill credit or a bill credit that is adjusted annually. The bill states that, on and after July 1, 2026, an annual adjustment mechanism must be applied to fixed bill credit rates to index the value of the fixed bill credit to changing rate trends.
A public utility is permitted under current law to recover its prudently incurred costs to facilitate a timely interconnection of a distributed energy resource. The bill prohibits a public utility from requiring an interconnection customer to pay the costs associated with interconnection facilities and upgrades until 30 days before the public utility incurs the costs. The bill allows a public utility to require an interconnection customer to provide security for the estimated full costs of interconnection at the time of mutual execution of an interconnection agreement.
The bill requires a public utility to:
- On or before July 1, 2026, develop a process to allow an interconnection customer to contract with a third party to perform an interconnection study;
- On or before September 1, 2026, develop a process to allow for the concurrent performance of all needed interconnection studies; and
- On or before October 1, 2026, develop a process to allow an interconnection customer to contract with a third party to perform any upgrades needed for interconnection, including engineering, procurement, and construction upgrades.
An interconnection study and upgrades that are performed by a contracted third party must meet applicable safety, reliability, labor, and technical standards.
Page 2, Line 1Be it enacted by the General Assembly of the State of Colorado:
Page 2, Line 2SECTION 1. Short title. The short title of this act is the
Page 2, Line 3"Advancing Grid Resilience Using Distributed Energy Resources Act".
Page 2, Line 4SECTION 2. Legislative declaration. (1) The general assembly
Page 2, Line 5finds and declares that:
Page 2, Line 6(a) Demand for electricity is quickly increasing, and the ability of
Page 2, Line 7electric utilities to affordably satisfy demand while preserving reliability
Page 2, Line 8is increasingly important;
Page 2, Line 9(b) Electricity generation sources in the state are increasingly
Page 2, Line 10renewable due to consumer demand, state policy, and the lower
Page 2, Line 11generation costs of renewable electricity, and distributed energy resources
Page 3, Line 1like community solar, dispatchable distributed generation, and distributed
Page 3, Line 2energy storage play an important role in satisfying such increasing
Page 3, Line 3electricity demand in an affordable way;
Page 3, Line 4(c) Since 2011, the state has consistently encouraged the
Page 3, Line 5deployment of community solar gardens to ensure that Coloradans
Page 3, Line 6without access to rooftop solar can still choose to use solar power, and
Page 3, Line 7ratepayers with low incomes, in particular, can benefit from community
Page 3, Line 8solar bill credits that reduce monthly utility bills;
Page 3, Line 9(d) Dispatchable distributed generation facilities, like solar paired
Page 3, Line 10with battery storage, are increasingly recognized as important
Page 3, Line 11cost-effective grid reliability resources;
Page 3, Line 12(e) While state policy remains strongly in favor of lower-cost and
Page 3, Line 13cleaner renewable energy generation, federal policy has drastically
Page 3, Line 14changed to discourage these resources;
Page 3, Line 15(f) The enactment of H.R. 1, Pub.L. 119-21, in 2025 eliminated
Page 3, Line 16tax incentives from certain electricity generation sources, including solar,
Page 3, Line 17while retaining favorable tax incentives for some nonrenewable forms of
Page 3, Line 18electricity generation;
Page 3, Line 19(g) H.R. 1, Pub.L. 119-21, also expires federal tax credits for new
Page 3, Line 20solar generation facilities at the end of 2029 unless a new solar generation
Page 3, Line 21facility is fully operational by that time;
Page 3, Line 22(h) Federal tax credits are instrumental in incentivizing the use of
Page 3, Line 23solar resources for affordable power generation;
Page 3, Line 24(i) Community solar and dispatchable distributed generation
Page 3, Line 25facilities take multiple years to design, finance, permit, build, and
Page 3, Line 26interconnect to the electric grid;
Page 3, Line 27(j) In addition, the interconnection process often takes multiple
Page 4, Line 1years, thus delaying the building of a necessary energy resource and
Page 4, Line 2endangering the ability of the energy resource to cost-effectively deploy
Page 4, Line 3before the 2029 expiration of federal tax credits;
Page 4, Line 4(k) One of the most significant periods of time required in the
Page 4, Line 5building of new community solar and dispatchable distributed generation
Page 4, Line 6facilities is the time it takes for the utility to study interconnection impacts
Page 4, Line 7of the proposed facility and to make necessary developer-funded upgrades
Page 4, Line 8to the electric grid to enable safe interconnection;
Page 4, Line 9(l) Innovative ideas that facilitate a quicker and more economic
Page 4, Line 10interconnection process can greatly assist the deployment of necessary
Page 4, Line 11community solar and dispatchable distributed generation resources, thus
Page 4, Line 12assisting electric utilities in providing clean and affordable power to
Page 4, Line 13ratepayers;
Page 4, Line 14(m) Maintaining the value of bill credits for community solar
Page 4, Line 15subscribers, particularly for ratepayers with low incomes, is important
Page 4, Line 16amid the rising cost of living; and
Page 4, Line 17(n) As a result of new federal policy, some adjustments need to be
Page 4, Line 18made to the state's community solar and dispatchable distributed
Page 4, Line 19generation programs in order to maintain the programs' benefits to the
Page 4, Line 20electric grid and ratepayers.
Page 4, Line 21(2) Therefore, it is the intent of the general assembly to:
Page 4, Line 22(a) Continue to encourage the development of distributed energy
Page 4, Line 23resources like community solar and dispatchable distributed generation;
Page 4, Line 24and
Page 4, Line 25(b) Make adjustments to state law to facilitate the timely and
Page 4, Line 26cost-effective deployment of distributed energy resources, while
Page 4, Line 27maintaining the value of such resources for community solar subscribers
Page 5, Line 1and particularly for ratepayers with low incomes.
Page 5, Line 2SECTION 3. In Colorado Revised Statutes, 40-2-127, amend
Page 5, Line 3(5)(b)(II)(C) as follows:
Page 5, Line 440-2-127. Community energy funds - community solar
Page 5, Line 5gardens - definitions - rules - legislative declaration - applicability -
Page 5, Line 6repeal.
Page 5, Line 7(5) Purchases of the output from community solar gardens.
Page 5, Line 8(b) (II) (C) For a subscriber organization that directs the
Page 5, Line 9qualifying retail utility to provide the subscriber organization's
Page 5, Line 10subscribers with a fixed bill credit, the net metering credit is calculated
Page 5, Line 11by multiplying the subscriber's share of the electricity production from the
Page 5, Line 12community solar garden by the qualifying retail utility's total aggregate
Page 5, Line 13retail rate as charged to the subscriber at the time the subscriber
Page 5, Line 14organization applies for or bids capacity into a utility community solar
Page 5, Line 15garden program, minus a reasonable charge, as determined by the
Page 5, Line 16commission at the time the subscriber organization applies for or bids
Page 5, Line 17capacity into a utility community solar garden program. The charge will
Page 5, Line 18be used to cover the utility's costs related to: Delivering to the subscriber's
Page 5, Line 19premises the electricity generated by the community solar garden,
Page 5, Line 20integrating the solar generation with the utility's system, and
Page 5, Line 21administering contracts and net metering credits for the community solar
Page 5, Line 22garden. On and after July 1, 2026, for a subscriber organization
Page 5, Line 23that directs the qualifying retail utility to provide a fixed bill
Page 5, Line 24credit, the qualifying retail utility shall index the value of the
Page 5, Line 25fixed bill credit to a community solar garden subscriber to
Page 5, Line 26changing rate trends by applying an annual adjustment
Page 5, Line 27mechanism to the bill credit equal to the most recent annual
Page 6, Line 1change in the qualifying retail utility's total aggregate retail
Page 6, Line 2rate, including all billed rate components based on the
Page 6, Line 3subscriber's rate class.
Page 6, Line 4SECTION 4. In Colorado Revised Statutes, 40-2-135, amend (6);
Page 6, Line 5and add (7) as follows:
Page 6, Line 640-2-135. Retail distributed generation - customers' rights -
Page 6, Line 7rules - penalties.
Page 6, Line 8(6) (a) A public utility may recover its prudently incurred costs to
Page 6, Line 9facilitate a timely interconnection, which costs may include the cost of
Page 6, Line 10equipment that the public utility procures for future upgrades needed to
Page 6, Line 11interconnect retail distributed generation resources. A public utility may
Page 6, Line 12recover the costs of any such equipment inventory as capital work in
Page 6, Line 13progress if the inventory is projected to be used within five years
ofPage 6, Line 14after its procurement and with a return at the most recently authorized
Page 6, Line 15weighted average cost of capital.
Page 6, Line 16(b) A public utility shall not require an interconnection
Page 6, Line 17customer to pay the costs associated with reasonable and
Page 6, Line 18necessary interconnection facilities and upgrades until thirty
Page 6, Line 19days before the public utility incurs the costs. A public utility
Page 6, Line 20may require an interconnection customer to provide security
Page 6, Line 21for the estimated full costs of interconnection at the time both
Page 6, Line 22parties execute an interconnection agreement. A public utility
Page 6, Line 23shall provide security options to the interconnection customer,
Page 6, Line 24including acceptance of a surety bond or a letter of credit from
Page 6, Line 25a qualified provider.
Page 6, Line 26(7) (a) On or before July 1, 2026, a public utility shall
Page 6, Line 27develop a process to allow an interconnection customer to
Page 7, Line 1contract with a third party to perform any needed
Page 7, Line 2interconnection study. A public utility shall respond to a
Page 7, Line 3third-party interconnection study request submitted by an
Page 7, Line 4interconnection customer within fifteen days after the
Page 7, Line 5submission of the interconnection study request. An
Page 7, Line 6interconnection study performed by a third party must meet
Page 7, Line 7applicable safety, reliability, labor, and technical standards.
Page 7, Line 8(b) On or before September 1, 2026, a public utility shall
Page 7, Line 9develop a process to allow for the concurrent performance of
Page 7, Line 10all needed interconnection studies, including interconnection
Page 7, Line 11studies performed by a contracted third party. Each
Page 7, Line 12interconnection study performed must meet applicable safety,
Page 7, Line 13reliability, labor, and technical standards.
Page 7, Line 14(c) On or before October 1, 2026, a public utility shall
Page 7, Line 15develop a process to allow an interconnection customer to
Page 7, Line 16contract with a third party to perform any upgrades needed for
Page 7, Line 17interconnection, including engineering, procurement, and
Page 7, Line 18construction upgrades. A public utility shall not impose
Page 7, Line 19unreasonable restrictions on upgrades performed by a
Page 7, Line 20contracted third party and shall respond to upgrade plans
Page 7, Line 21submitted by an interconnection customer within thirty days
Page 7, Line 22after the submission of the upgrade plans. Upgrades that are
Page 7, Line 23performed by a contracted third party must meet applicable
Page 7, Line 24safety, reliability, labor, and technical standards.
Page 7, Line 25(d) An interconnection customer may appeal to the
Page 7, Line 26commission a public utility's denial of the interconnection
Page 7, Line 27customer's request to contract with a third party to perform an
Page 8, Line 1interconnection study or upgrade.
Page 8, Line 2SECTION 5. Safety clause. The general assembly finds,
Page 8, Line 3determines, and declares that this act is necessary for the immediate
Page 8, Line 4preservation of the public peace, health, or safety or for appropriations for
Page 8, Line 5the support and maintenance of the departments of the state and state
Page 8, Line 6institutions.