Senate Committee of Reference Report

Committee on Transportation & Energy

All text that will be removed from the bill will be indicated by strikethrough as follows:

This is text that is removed from law.

Text that is added to a bill will be indicated by either all capitals or bold & italic as follows:

  • This all capitals text would be added to law.
  • This is bold & italic text that would be added to law.

April 1, 2026

After consideration on the merits, the Committee recommends the following:

HB26-1081   be amended as follows, and as so amended, be referred to the Committee of the Whole with favorable recommendation:

Page 1, Line 1Amend reengrossed bill, page 6, line 4, strike "(7) and (8)" and substitute

Page 1, Line 2"(7), (8), and (9)".

Page 1, Line 3Page 6, line 14, strike "Identify" and substitute "For utilities subject

Page 1, Line 4to rate regulation by the commission, identify".

Page 1, Line 5Page 6, strike line 17 and substitute "considering, after evaluating

Page 1, Line 6whether applicable, the use of bonds issued by the Colorado

Page 1, Line 7electric transmission".

Page 1, Line 8Page 8, after line 26 insert:

Page 1, Line 9"(9) (a)  In amending its rules pursuant to subsection (6) of

Page 1, Line 10this section, the commission shall seek to minimize duplication of

Page 1, Line 11transmission planning processes, technical studies, or analyses

Page 1, Line 12conducted through an applicable regional transmission

Page 1, Line 13organization or independent system operator. In doing so, the

Page 1, Line 14commission may allow a utility to reference and incorporate

Page 1, Line 15analyses conducted through an applicable regional

Page 1, Line 16transmission organization or independent system operator, as

Page 1, Line 17appropriate, and to rely on these analyses to satisfy the

Page 1, Line 18requirements of this section to the extent that the analyses

Page 1, Line 19address the requirements of this section.

Page 1, Line 20(b)  A utility relying on analyses conducted through an

Page 1, Line 21applicable regional transmission organization or independent

Page 1, Line 22system operator shall identify in the utility's filing the section

Page 1, Line 23of each analysis that addresses the requirements of the

Page 1, Line 24advanced transmission technologies evaluation set forth in

Page 2, Line 1subsection (6)(d) of this section and the relevance of the

Page 2, Line 2analysis to those requirements.

Page 2, Line 3(c)  Participation in a regional transmission planning

Page 2, Line 4process does not by itself satisfy the requirements of commission

Page 2, Line 5rules amended pursuant to subsection (6) of this section.".