A Bill for an Act
Page 1, Line 101Concerning requiring a public utility to provide written
Page 1, Line 102notice to an owner of real property before beginning
Page 1, Line 103a project that will require the use of the real
Page 1, Line 104property.
Bill Summary
(Note: This summary applies to this bill as introduced and does not reflect any amendments that may be subsequently adopted. If this bill passes third reading in the house of introduction, a bill summary that applies to the reengrossed version of this bill will be available at http://leg.colorado.gov.)
The bill requires a public utility to provide, at least 90 days before beginning the construction or extension of a new facility, line, plant, or system, notice by certified mail to each owner of private real property that will be used as a result of the construction or extension and to publish notice in a newspaper of general circulation in the area of the real property.
The bill requires a public utility to host at least one in-person public meeting at least 30 days after, but no later than 60 days after, providing notice.
Page 2, Line 1Be it enacted by the General Assembly of the State of Colorado:
Page 2, Line 2SECTION 1. In Colorado Revised Statutes, 40-5-101, add (5) as
Page 2, Line 3follows:
Page 2, Line 440-5-101. New construction - extension - compliance with local
Page 2, Line 5zoning rules - landowner notice - definitions.
Page 2, Line 6(5) (a) At least ninety days before beginning the
Page 2, Line 7construction or extension of a new facility, line, plant, or
Page 2, Line 8system, which construction or extension will require the use of
Page 2, Line 9private real property, a public utility shall provide sufficient
Page 2, Line 10notice to each owner of the real property that will be used,
Page 2, Line 11regardless of whether the real property is subject to a utility
Page 2, Line 12easement.
Page 2, Line 13(b) At least thirty days after, but no later than sixty
Page 2, Line 14days after, providing sufficient notice in accordance with
Page 2, Line 15subsection (5)(a) of this section, a public utility shall host at
Page 2, Line 16least one in-person public meeting in the county where the
Page 2, Line 17construction or extension will occur.
Page 2, Line 18(c) As used in this subsection (5), "sufficient notice" means
Page 2, Line 19a letter sent by certified mail from or on behalf of a public
Page 2, Line 20utility to an owner of real property and publication in a
Page 2, Line 21newspaper of general circulation within the area of the real
Page 2, Line 22property, which letter and publication must include:
Page 3, Line 1(I) The name, address, telephone number, and named point
Page 3, Line 2of contact for the public utility;
Page 3, Line 3(II) The real property address;
Page 3, Line 4(III) The recording number of any utility easement or
Page 3, Line 5recorded memorandum of any utility easement;
Page 3, Line 6(IV) A general description of any existing public utility
Page 3, Line 7service infrastructure already located in a relevant utility
Page 3, Line 8easement and the approximate location of the utility easement;
Page 3, Line 9(V) A citation to this section;
Page 3, Line 10(VI) An estimated time for the start of construction;
Page 3, Line 11(VII) A notice that interested persons may submit written
Page 3, Line 12comments to the public utility at any time before the start of
Page 3, Line 13construction; and
Page 3, Line 14(VIII) The date, time, and location for the public meeting
Page 3, Line 15hosted by the public utility pursuant subsection (5)(b) of this
Page 3, Line 16section.
Page 3, Line 17SECTION 2. Act subject to petition - effective date -
Page 3, Line 18applicability. (1) This act takes effect at 12:01 a.m. on the day following
Page 3, Line 19the expiration of the ninety-day period after final adjournment of the
Page 3, Line 20general assembly (August 12, 2026, if adjournment sine die is on May 13,
Page 3, Line 212026); except that, if a referendum petition is filed pursuant to section 1
Page 3, Line 22(3) of article V of the state constitution against this act or an item, section,
Page 3, Line 23or part of this act within such period, then the act, item, section, or part
Page 3, Line 24will not take effect unless approved by the people at the general election
Page 3, Line 25to be held in November 2026 and, in such case, will take effect on the
Page 3, Line 26date of the official declaration of the vote thereon by the governor.
Page 4, Line 1(2) This act applies to public utility construction or extension
Page 4, Line 2projects commenced on or after the applicable effective date of this act.