House Committee of Reference Report

Committee on Energy & Environment

All text that will be removed from the bill will be indicated by strikethrough as follows:

This is text that is removed from law.

Text that is added to a bill will be indicated by either all capitals or bold & italic as follows:

  • This all capitals text would be added to law.
  • This is bold & italic text that would be added to law.

February 26, 2026

After consideration on the merits, the Committee recommends the following:

HB26-1081   be amended as follows, and as so amended, be referred to the Committee of the Whole with favorable recommendation:

Page 1, Line 1Amend printed bill, page 5, line 4, strike "seventy-five" and substitute

Page 1, Line 2"sixty".

Page 1, Line 3Page 5, line 27, strike "(6)" and substitute "(6); and add (7)".

Page 1, Line 4Page 6, line 23, strike "the potential of".

Page 1, Line 5Page 6, lines 24 and 25, strike "to meet transmission needs and

Page 1, Line 6realize potential benefits,".

Page 1, Line 7Page 7, line 1, strike "A" and substitute "If technically feasible, a".

Page 1, Line 8Page 7, strike line 4 and substitute "technologies able to reduce or

Page 1, Line 9mitigate transmission system needs with the potential to achieve

Page 1, Line 10the following, as applicable:".

Page 1, Line 11Page 7, line 12, strike "resources;" and substitute "resources

Page 1, Line 12reflecting the utility's generation and load planning forecasts

Page 1, Line 13from the utility's most recent electric resource plan;".

Page 1, Line 14Page 8, after line 5 insert:

Page 1, Line 15"(7)  An identification of a wildfire-related benefit as

Page 1, Line 16described in subsection (6)(d)(III)(D) of this section in an

Page 1, Line 17assessment of advanced transmission technologies conducted

Page 1, Line 18by a utility pursuant to subsection (6)(d)(III) of this section does

Page 1, Line 19not trigger a separate commission approval process. The

Page 1, Line 20commission may consider the identified wildfire-related benefit

Page 2, Line 1during the commission's review of the utility's next wildfire

Page 2, Line 2mitigation plan filing or a future certificate of public

Page 2, Line 3convenience and necessity filed by the utility.".