Senate Bill 25-111 Reengrossed

LLS NO. 25-0549.01 Craig Harper x3481
First Regular Session
Seventy-fifth General Assembly
State of Colorado

Senate Sponsorship

Bridges, Amabile, Kirkmeyer

House Sponsorship

Bird, Sirota, Taggart


This Version Includes All Amendments Adopted in the House of Introduction

Senate 3rd Reading Unamended February 6, 2025

Senate 2nd Reading Unamended February 5, 2025


Senate Committees

Appropriations

House Committees

No committees scheduled.


Strikethrough:
removed from existing law
Screen Reader Only:
all text indicated as strikethrough will begin as 'deleted from existing statue' and finish with 'end deletion'
All-caps or Bold and Italic:
added to existing law
Screen Reader Only:
all text indicated as all-caps or bold and italic will begin as 'added to existing law' and finish with 'end insertion'
Underline:
Senate Amendment
Highlight:
House Amendment

A Bill for an Act


Bill Summary

(Note: This summary applies to this bill as introduced and does not reflect any amendments that may be subsequently adopted. If this bill passes third reading in the house of introduction, a bill summary that applies to the reengrossed version of this bill will be available at http://leg.colorado.gov.)

Supplemental appropriations are made for capital construction projects.


Page 1, Line 1Be it enacted by the General Assembly of the State of Colorado:

Page 2, Line 1SECTION 1.Capital construction appropriations for the fiscal

Page 2, Line 2year beginning July 1, 2024. In Session Laws of Colorado 2024, amend

Page 2, Line 3section 3 of chapter 519, (HB 24-1430), as follows:

Page 2, Line 4Section 3.  Capital Construction Appropriation.

Page 3, Line 1Part I

Page 3, Line 2CONTROLLED MAINTENANCE

Page 3, Line 3

Page 3, Line 4(1) STATE AGENCIES

Page 3, Line 5(A) Department of Agriculture

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 3, Line 6Replace Retractable Seating,

Page 3, Line 7Events Center, State Fair

1,943,571

1,943,571

Page 3, Line 8Fire Suppression, Code, ADA,

Page 3, Line 9and HVAC Upgrades, Creative

Page 3, Line 10Arts Building, State Fair

1,995,357

1,995,357

Page 3, Line 11

3,938,928

Page 3, Line 12

Page 3, Line 13(B) Department of Corrections

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 3, Line 14Replace Kitchen Refrigeration

Page 3, Line 15System, Fremont Correctional

Page 3, Line 16Facility

1,440,043

1,440,043

Page 4, Line 1Replace Roofs, Living Units

Page 4, Line 2and Support Buildings, Delta

Page 4, Line 3Correctional Center

1,923,384

1,923,384

Page 4, Line 4Security Perimeter

Page 4, Line 5Improvements, Sterling

Page 4, Line 6Correctional Facility

1,417,984

1,417,984

Page 4, Line 7

4,781,411

Page 4, Line 8

Page 4, Line 9(C) Department of Education

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 4, Line 10Elevator Upgrade and

Page 4, Line 11Modernization, Colorado

Page 4, Line 12School for the Deaf and the

Page 4, Line 13Blind

1,999,470

1,999,470

Page 5, Line 1Upgrade Security, Colorado

Page 5, Line 2School for the Deaf and the

Page 5, Line 3Blind

1,999,176

1,999,176

Page 5, Line 4

3,998,646

Page 5, Line 5

Page 5, Line 6(D) Department of Higher Education - History Colorado

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 5, Line 7Exterior Life Safety Repairs,

Page 5, Line 8Grant Humphreys Mansion

704,618

704,618

Page 5, Line 9

Page 5, Line 10(E) Department of Human Services

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 5, Line 11Fire Detection Replacement,

Page 5, Line 12CMHIFL

1,972,961

1,972,961

Page 5, Line 13Install IP Cameras and

Page 5, Line 14Infrastructure, CMHIP and

Page 5, Line 15Spring Creek YSC

1,869,697

1,869,697

Page 6, Line 1Replace Domestic Water

Page 6, Line 2Softeners, Pumps, and

Page 6, Line 3Compressors, Building 35;

Page 6, Line 4Replace Chiller, Building 118,

Page 6, Line 5CMHIP

1,809,660

1,809,660

Page 6, Line 6Replace Elevators, Buildings

Page 6, Line 7115 and 116, CMHIP

1,058,005

1,058,005

Page 6, Line 8Replace Fire Detection and

Page 6, Line 9Suppression Systems, Mount

Page 6, Line 10View YSC

1,274,203

1,274,203

Page 6, Line 11Replace HVAC Systems,

Page 6, Line 12NCD, DYS, and

Page 6, Line 13CALM

1,946,974

1,946,974

Page 7, Line 1Upgrade Food Storage Cooler

Page 7, Line 2and Freezer, Building 55,

Page 7, Line 3CMHIP

1,295,520

1,295,520

Page 7, Line 4

11,227,020

Page 7, Line 5

Page 7, Line 6(F) Department of Military and Veterans Affairs

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 7, Line 7Remodel Auditorium, Upgrade

Page 7, Line 8HVAC, and Replace Roof,

Page 7, Line 9Denver Readiness Center

2,437,177

1,218,588

1,218,589(I)

Page 7, Line 10Upgrade Site Security Lighting,

Page 7, Line 11Various Readiness Centers

921,668

232,667

689,001(I)

Page 7, Line 12

3,358,845

Page 7, Line 13

Page 7, Line 14(G) Department of Personnel

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 7, Line 15Controlled Maintenance

Page 7, Line 16Emergency Account

3,000,000

3,000,000

Page 8, Line 1Modernize Passenger Elevators,

Page 8, Line 2State Capitol Building

1,753,895

1,753,895

Page 8, Line 3Replace Water and Fire Line,

Page 8, Line 4Camp George West

1,826,604

1,826,604

Page 8, Line 5Upgrade/Replace HVAC

Page 8, Line 6Systems, 690 and 700 Kipling

1,146,048

1,146,048

Page 8, Line 7

7,726,547

Page 8, Line 8

Page 8, Line 9(H) Department of Local Affairs

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 8, Line 10Fort Lyon Decentralized

Page 8, Line 11Building Heating, Design

Page 8, Line 12Phase

796,840

796,840

Page 8, Line 13

Page 8, Line 14

35,736,015

Page 8, Line 15

36,532,855

Page 8, Line 16

Page 9, Line 1(2) INSTITUTIONS OF HIGHER EDUCATION

Page 9, Line 2(A) Adams State University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 9, Line 3Repair Electrical Distribution,

Page 9, Line 4Campuswide

832,598

832,598

Page 9, Line 5

Page 9, Line 6(B) Arapahoe Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 9, Line 7Upgrade Door Hardware and

Page 9, Line 8Access Controls, Campuswide

1,668,726

1,668,726

Page 9, Line 9Expand Fire Sprinkler System,

Page 9, Line 10Main Building

1,965,277

1,965,277

Page 9, Line 11

3,634,003

Page 9, Line 12

Page 9, Line 13(C) Auraria Higher Education Center

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 9, Line 14Upgrade Classroom Security

1,299,517

1,299,517

Page 10, Line 1Replace Transformers, Four

Page 10, Line 2Buildings

1,847,434

1,847,434

Page 10, Line 3

3,146,951

Page 10, Line 4

Page 10, Line 5(D) Colorado Community College System Lowry Campus

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 10, Line 6Elevator Upgrades, Six

Page 10, Line 7Buildings

640,943

640,943

Page 10, Line 8

Page 10, Line 9(E) Colorado School of Mines

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 10, Line 10Replace Obsolete Temperature

Page 10, Line 11Controls, Campuswide

1,060,051

1,060,051

Page 10, Line 12Replace Roof, Brown Hall

1,339,315

1,339,315

Page 10, Line 13Repair Utilities, Engineering

Page 10, Line 14Hall

1,700,743

1,700,743

Page 11, Line 1Replace Steinhauer Air

Page 11, Line 2Handlers

1,805,521

1,805,521

Page 11, Line 3

5,905,630

Page 11, Line 4

Page 11, Line 5(F) Colorado State University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 11, Line 6Biosecurity Upgrades, Various

Page 11, Line 7Buildings

351,365

351,365

Page 11, Line 8Replace Roof, SARA Building

432,242

432,242

Page 11, Line 9Replace Lead Joint Water Line,

Page 11, Line 10Fort Collins Campus

1,581,360

1,581,360

Page 11, Line 11Upgrade Christman Field

1,992,997

1,992,997

Page 11, Line 12

4,357,964

Page 11, Line 13

Page 11, Line 14(G) Colorado State University - Pueblo

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 11, Line 15Upgrade Security Hardware

985,710

985,710

Page 12, Line 1Upgrade Campus Accessibility

1,188,000

1,188,000

Page 12, Line 2

2,173,710

Page 12, Line 3

Page 12, Line 4(H) Front Range Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 12, Line 5Modify Restrooms, Harmony

Page 12, Line 6Library, Larimer Campus

845,000

745,000

100,000a

Page 12, Line 7Replace North Water/Fire Line,

Page 12, Line 8Westminster Campus

2,126,000

2,000,000

126,000a

Page 12, Line 9Replace South Water/Fire Line,

Page 12, Line 10Westminster Campus

2,126,000

2,000,000

126,000a

Page 12, Line 11

5,097,000

Page 12, Line 12

Page 12, Line 13a These amounts shall be from institutional cash funds.

Page 12, Line 14

Page 12, Line 15

Page 13, Line 1(I) Lamar Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 13, Line 2Upgrade Fire Alarm Systems,

Page 13, Line 3Betz Technology and Wellness

Page 13, Line 4Center

645,135

645,135

Page 13, Line 5

Page 13, Line 6(J) Northwestern Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 13, Line 7Repair/Replace Parking Lots

Page 13, Line 8and Sidewalks, Rangely

Page 13, Line 9Campus

1,971,945

1,971,945

Page 13, Line 10

Page 13, Line 11(K) Otero Junior College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 13, Line 12Upgrade Fire Safety, Egress,

Page 13, Line 13and Exit Paths, McDivitt Center

719,362

719,362

Page 13, Line 14Upgrade for Code Compliance,

Page 13, Line 15McDivitt Center

1,012,644

1,012,644

Page 14, Line 1Convert Variable Refrigerant

Page 14, Line 2Flow, Wheeler/Life Science

Page 14, Line 3Buildings

1,662,298

1,662,298

Page 14, Line 4

3,394,304

Page 14, Line 5

Page 14, Line 6(L) Pueblo Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 14, Line 7Modernize Elevators, Gorisch

Page 14, Line 8Building

152,130

152,130

Page 14, Line 9

Page 14, Line 10(M) Red Rocks Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 14, Line 11Upgrade West End Rooftop

Page 14, Line 12Unit, Lakewood Campus

480,462

480,462

Page 14, Line 13

Page 14, Line 14

Page 14, Line 15

Page 15, Line 1

Page 15, Line 2(N) Trinidad State Junior College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 15, Line 3Upgrade HVAC Air Quality

Page 15, Line 4and Building Safety, Alamosa

Page 15, Line 5Campus

1,997,830

1,997,830

Page 15, Line 6

Page 15, Line 7(O) University of Colorado - Anschutz

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 15, Line 8Retrofit Cooling Tower and

Page 15, Line 9Pump, Fitzsimons Building

1,836,596

1,836,596

Page 15, Line 10

Page 15, Line 11(P) University of Colorado - Boulder

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 15, Line 12Improve Rooftop Safety, Five

Page 15, Line 13Buildings

653,186

653,186

Page 15, Line 14Repair Exterior Structure, Hale

Page 15, Line 15Science

1,069,989

1,069,989

Page 16, Line 1Replace Campus Domestic

Page 16, Line 2Water Heat Exchangers, Bruce

Page 16, Line 3Curtis, Koelbel, and Ekeley

Page 16, Line 4Buildings

1,357,724

1,357,724

Page 16, Line 5Upgrade Classroom Security

1,752,784

1,752,784

Page 16, Line 6Window Replacement,

Page 16, Line 7Engineering Center Office

Page 16, Line 8Tower

1,811,829

1,811,829

Page 16, Line 9Sewage Treatment System

Page 16, Line 10Repairs, Mountain Research

Page 16, Line 11Station

1,927,894

1,927,894

Page 16, Line 12

8,573,406

Page 16, Line 13

Page 16, Line 14

Page 16, Line 15

Page 16, Line 16

Page 17, Line 1(Q) University of Colorado - Colorado Springs

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 17, Line 2Modernize Elevators

1,999,447

1,999,447

Page 17, Line 3

Page 17, Line 4(R) University of Colorado - Anschutz

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 17, Line 5Vivarium Air Valve, R1 North

1,842,685

1,842,685

Page 17, Line 6

Page 17, Line 7(S) University of Northern Colorado

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 17, Line 8Emergency Generator

Page 17, Line 9Replacement, Gray Hall

487,953

487,953

Page 17, Line 10Replace Roof, Michener

Page 17, Line 11Library

1,122,845

1,122,845

Page 17, Line 12

1,610,798

Page 17, Line 13

Page 17, Line 14

Page 17, Line 15

Page 18, Line 1(T) Pikes Peak State College

Page 18, Line 2Slope Mitigation at Firing

Page 18, Line 3Range, Centennial Campus

1,105,000

1,105,000

Page 18, Line 4

Page 18, Line 5

51,398,537

Page 18, Line 6

Page 18, Line 7

Page 18, Line 8TOTALS PART I

Page 18, Line 9(CONTROLLED

Page 18, Line 10MAINTENANCE)

$87,134,552

$84,874,962

$352,000

$1,907,590

Page 18, Line 11

$87,931,392

$85,671,802

Page 18, Line 12

Page 18, Line 13

Page 18, Line 14

Page 18, Line 15

Page 19, Line 1Part II

Page 19, Line 2STATE AGENCIES

Page 19, Line 3

Page 19, Line 4(1) CAPITAL RENEWAL AND RECAPITALIZATION

Page 19, Line 5(A) Department of Corrections

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 19, Line 6Access Controls Electronic

Page 19, Line 7Security System Replacement,

Page 19, Line 8Sterling Correctional Facility

Page 19, Line 9(Capital Renewal)

33,317,516

33,317,516

Page 19, Line 10Steam Condensate Line

Page 19, Line 11Replacement, Sterling

Page 19, Line 12Correctional Facility (Capital

Page 19, Line 13Renewal)

16,367,112

16,367,112

Page 19, Line 14

49,684,628

Page 19, Line 15

Page 19, Line 16

Page 20, Line 1(B) Department of Higher Education

Page 20, Line 2(1) History Colorado

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 20, Line 3Regional Museum Preservation

Page 20, Line 4Projects

700,000

700,000a

Page 20, Line 5

Page 20, Line 6a This amount shall be from the Museum and Preservation Operations Account of the State Historical Fund created in Section 44-30-1201 (5)(c)(I)(B), C.R.S.

Page 20, Line 7

Page 20, Line 8(C) Department of Human Services

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 20, Line 9Regional Center Kitchens,

Page 20, Line 10Pools, and Parking Lots

1,483,534

1,483,534

Page 20, Line 11Kitchen Replacement, CMHIP

9,899,619

9,899,619

Page 20, Line 12Depreciation Fund Capital

Page 20, Line 13Improvements

1,547,881

1,547,881a

Page 20, Line 14

12,931,034

Page 20, Line 15

Page 21, Line 1a This amount shall be from the Regional Center Depreciation Account in the Capital Construction Fund, created in Section 24-75-302 (3.8)(a), C.R.S.

Page 21, Line 2

Page 21, Line 3(D) Department of Natural Resources

Page 21, Line 4(1) Division of Parks and Wildlife

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 21, Line 5Infrastructure and Real Property

Page 21, Line 6Maintenance

34,001,000

34,001,000a

Page 21, Line 7

Page 21, Line 8a Of this amount, $31,201,000 shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S., $2,500,000 shall be from the Parks and Outdoor Recreation Cash Fund

Page 21, Line 9created in Section 33-10-111 (1), C.R.S., and $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section

Page 21, Line 1033-10-111 (4), C.R.S.

Page 21, Line 11

Page 21, Line 12(E) Department of Personnel

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 21, Line 13Capitol Complex Renovation

Page 21, Line 14and Footprint Reduction

18,179,092

18,179,092a

Page 22, Line 1Kipling Campus Chiller

Page 22, Line 2(Capital Renewal)

3,717,529

3,717,529

Page 22, Line 3

21,896,621

Page 22, Line 4

Page 22, Line 5a This amount shall be from the Capitol Complex Renovation Fund created in Section 24-30-1313 (1), C.R.S.

Page 22, Line 6

Page 22, Line 7(F) Department of Transportation

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 22, Line 8Highway Construction Projects

500,000

500,000

Page 22, Line 9

Page 22, Line 10

119,713,283

Page 22, Line 11

Page 22, Line 12

Page 22, Line 13

Page 22, Line 14

Page 23, Line 1(2) CAPITAL EXPANSION

Page 23, Line 2(A) Department of Natural Resources

Page 23, Line 3(1) Division of Parks and Wildlife

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 23, Line 4Property Acquisition and

Page 23, Line 5Improvements

25,000,000

25,000,000a

Page 23, Line 6

Page 23, Line 7a This amount shall be from the Wildlife Cash Fund created in Section 33-1-112 (1)(a), C.R.S.

Page 23, Line 8

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 23, Line 9

25,000,000

Page 23, Line 10

Page 23, Line 11

Page 23, Line 12TOTALS PART II

Page 23, Line 13(STATE AGENCIES)

$144,713,283

$65,285,310

$79,427,973

Page 23, Line 14

Page 23, Line 15

Page 24, Line 1Part III

Page 24, Line 2INSTITUTIONS OF HIGHER EDUCATION

Page 24, Line 3

Page 24, Line 4(1) CAPITAL RENEWAL AND RECAPITALIZATION

Page 24, Line 5(A) Colorado State University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 24, Line 6Clark Building Renovation and

Page 24, Line 7Addition

31,814,757

23,814,757

8,000,000a

Page 24, Line 8

Page 24, Line 9a This amount shall be from institutional sources.

Page 24, Line 10

Page 24, Line 11(B) Colorado State University - Pueblo

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 24, Line 12Technology Building

Page 24, Line 13Renovation and Addition

14,702,642

14,253,042

449,600a

Page 24, Line 14

Page 24, Line 15a This amount shall be from institutional reserves.

Page 25, Line 1

Page 25, Line 2(C) Northwestern Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 25, Line 3Siding, Insulation, and Window

Page 25, Line 4Replacement, Rangely Campus

Page 25, Line 5(Capital Renewal)

3,641,741

3,641,741

Page 25, Line 6

Page 25, Line 7(D) Western Colorado University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 25, Line 8Crawford Hall Renovation

Page 25, Line 9(Capital Renewal)

4,087,593

3,920,002

167,591a

Page 25, Line 10

Page 25, Line 11a This amount shall be from institutional reserves.

Page 25, Line 12

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 25, Line 13

54,246,733

Page 25, Line 14

Page 25, Line 15

Page 26, Line 1(2) CAPITAL EXPANSION

Page 26, Line 2(A) Adams State University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 26, Line 3Facility Services Center

Page 26, Line 4Replacement

29,424,616

28,247,631

1,176,985a

Page 26, Line 5

Page 26, Line 6a This amount shall be from institutional reserves.

Page 26, Line 7

Page 26, Line 8(B) Auraria Higher Education Center

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 26, Line 9Campus Safety Center

19,889,027

19,889,027

Page 26, Line 10

Page 26, Line 11(C) Colorado Mesa University

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 26, Line 12Performing Arts Center

Page 26, Line 13Expansion and Renovation

13,669,574

12,288,947

1,380,627a

Page 26, Line 14

Page 26, Line 15a This amount shall be from institutional reserves and donations.

Page 27, Line 1

Page 27, Line 2(D) Metropolitan State Universityof Denver

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 27, Line 3Classroom 2 Career Hub

18,600,000

6,000,000

12,600,000a

Page 27, Line 4

Page 27, Line 5a This amount shall be from donations.

Page 27, Line 6

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 27, Line 7

81,583,217

Page 27, Line 8

Page 27, Line 9

Page 27, Line 10TOTALS PART III

Page 27, Line 11(INSTITUTIONS OF

Page 27, Line 12HIGHER EDUCATION)

$135,829,950

$112,055,147

$23,774,803

Page 27, Line 13

Page 27, Line 14

Page 27, Line 15

Page 28, Line 1GRAND TOTALS

Page 28, Line 2(CAPITAL

Page 28, Line 3CONSTRUCTION)

$367,677,785

$262,215,419

$103,554,776a

$1,907,590b

Page 28, Line 4

$368,474,625

$263,012,259

Page 28, Line 5

Page 28, Line 6a Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.

Page 28, Line 7b This amount contains an (I) notation.

Page 28, Line 8

Page 29, Line 1SECTION 2.  Capital construction appropriations for the fiscal year beginning July 1, 2021. In Session Laws of Colorado 2021, section 3 of chapter 504, (SB 21-205),

Page 29, Line 2amend Part III (1)(A), (1)(G), and the affected totals, as the affected totals are amended by Session Laws of Colorado 2022, section 1 of chapter 505, (HB 22-1184), and as Part III (1)(A),

Page 29, Line 3(1)(G) and the affected totals are amended by Session Laws of Colorado 2023, section 3 of chapter 473, (SB 23-135), as follows:

Page 29, Line 4Section 3.  Capital Construction Appropriation.

Page 29, Line 5

Page 29, Line 6Part III

Page 29, Line 7INSTITUTIONS OF HIGHER EDUCATION

Page 29, Line 8

Page 29, Line 9(1) CAPITAL RENEWAL AND RECAPITALIZATION

Page 29, Line 10(A) Arapahoe Community College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 29, Line 11Health Programs Integration and

Page 29, Line 12Annex Building Renovation

14,652,093

8,364,000

6,288,093 a

Page 29, Line 13

16,373,520

6,758,897a

1,250,623(I)

Page 29, Line 14

Page 29, Line 15a This amount shall be from unrestricted institutional reserves and American Rescue Plan Act funds received through Arapahoe County.

Page 29, Line 16

Page 30, Line 1

Page 30, Line 2(G) Trinidad State Junior College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 30, Line 3Freudenthal Library Renovation,

Page 30, Line 4entry, Study Lounge, Gallery

Page 30, Line 5Lounge, and Level 1 through 3

Page 30, Line 6Restrooms

6,276,339

6,276,339

Page 30, Line 7

6,847,376

6,152,237

695,139a

Page 30, Line 8

Page 30, Line 9aThis amount shall be from donations to the college's foundation and other institutional sources.

Page 30, Line 10

Page 30, Line 11

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 30, Line 12TOTALS PART III

Page 30, Line 13(INSTITUTIONS OF HIGHER

Page 30, Line 14EDUCATION)

$158,693,16 2

$104,841,923

$53,851,239

Page 30, Line 15

$160,985,626

$104,717,821

$55,017,182

1,250,623

Page 31, Line 1

Page 31, Line 2

Page 31, Line 3GRAND TOTALS

Page 31, Line 4(CAPITAL CONSTRUCTION)

$314,579,786

$221,508,241

$88,178,862 a

$1,800,000

$3,092,683 b

Page 31, Line 5

$316,872,250

$221,384,139

$89,344,805a

$4,343,306b

Page 31, Line 6

Page 31, Line 7a Of this amount, $400,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.

Page 31, Line 8b This amount contains an (I) notation.

Page 31, Line 9

Page 32, Line 1SECTION 3.  Capital construction appropriations for the fiscal year beginning July 1, 2022. In Session Laws of Colorado 2022, section 3 of chapter 507, (HB 22-1329),

Page 32, Line 2amend Part III (1)(E) and the affected totals as the affected totals are amended by Session Laws of Colorado 2023, section 1 of chapter 473, (SB 23-135), and as Part III (1)(E) and the

Page 32, Line 3affected totals are amended by Session Laws of Colorado 2024, section 2 of chapter 517 (HB 24-1203), as the affected totals are amended by section 32 of chapter 257, (HB 24-1465),

Page 32, Line 4and as Part III is amended by section 82 of chapter 429, (HB 24-1466), as follows:

Page 32, Line 5Section 3.  Capital Construction Appropriation.

Page 32, Line 6Part III

Page 32, Line 7INSTITUTIONS OF HIGHER EDUCATION

Page 32, Line 8(1) CAPITAL RENEWAL AND RECAPITALIZATION

Page 32, Line 9(E) Trinidad State Junior College

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 32, Line 10Freudenthal Library Renovation

Page 32, Line 11Phase II, Library Archives and

Page 32, Line 12Patio Area

1,165,125

1,165,125 a

Page 32, Line 13

1,484,227

124,102

1,360,125a

Page 32, Line 14

Page 33, Line 1aThis amount Of this amount, $1,165,125 shall be from the Revenue Loss Restoration Cash Fund created in Section 24-75-227 (2)(a), C.R.S., originating from money the state

Page 33, Line 2received from the federal Coronavirus State Fiscal Recovery Fund. fund, and $195,000 shall be from donations to the college's foundation and other institutional

Page 33, Line 3sources.

Page 33, Line 4

Page 33, Line 5

Agency Name or Title Item & Subtotal Total Capital Construction Fund Cash Funds Reappropriated Funds Federal Funds

Page 33, Line 6TOTALS PART III

Page 33, Line 7(INSTITUTIONS OF

Page 33, Line 8HIGHER EDUCATION)

$231,843,861

$4,746,375

$227,097,486

Page 33, Line 9

$232,162,963

$4,870,477

$227,292,486

Page 33, Line 10

Page 33, Line 11

Page 33, Line 12GRAND TOTALS

Page 33, Line 13(CAPITAL

Page 33, Line 14CONSTRUCTION)

$509,567,234

$10,839,305

$496,962,599 a

$1,765,330b

Page 33, Line 15

$509,886,336

$10,963,407

$497,157,599a

Page 34, Line 1

Page 34, Line 2a Of this amount, $300,000 shall be from the Highway Users Tax Fund created in Section 43-4-201 (1)(a), C.R.S., and appropriated pursuant to Section 33-10-111 (4), C.R.S.

Page 34, Line 3b This amount contains an (I) notation.

Page 34, Line 4

Page 35, Line 1SECTION 4.  Safety clause. The general assembly finds,

Page 35, Line 2determines, and declares that this act is necessary for the immediate

Page 35, Line 3preservation of the public peace, health, or safety or for appropriations for

Page 35, Line 4the support and maintenance of the departments of the state and state

Page 35, Line 5institutions.